Obsolete Linaro project 2012.10

Milestone information

Project:
Obsolete Linaro project
Version:
2012.10
Expected:
2012-10-25  

Activities

Assigned to you:
No blueprints or bugs assigned to you.
Assignees:
1 Andy Doan, 8 Dave Pigott
Blueprints:
5 Implemented
Bugs:
4 Fix Released

5 blueprints and 4 bugs targeted

Blueprint Project Priority Assignee Delivery
Black Box Test Actions Black Box Test Actions LAVA Dispatcher LAVA Dispatcher 5 Essential Andy Doan  11 Implemented
Support v8 Model Device in LAVA Support v8 Model Device in LAVA LAVA Dispatcher LAVA Dispatcher 5 Essential Dave Pigott  11 Implemented
Purchase and deploy a router in the lab for connection to leased line Purchase and deploy a router in the lab for connection to leased line LAVA Validation Lab LAVA Validation Lab 4 High Dave Pigott  11 Implemented
Connect the LAVA test WiFi access point to the outside world Connect the LAVA test WiFi access point to the outside world LAVA Validation Lab LAVA Validation Lab 2 Low Dave Pigott  11 Implemented
Deploy more snowball PDK V11 boards in LAVA Deploy more snowball PDK V11 boards in LAVA LAVA Validation Lab LAVA Validation Lab 1 Undefined Dave Pigott  11 Implemented
Bug report Project Importance Assignee Status
1071266 #1071266 No mkdir for deploying android images LAVA Dispatcher LAVA Dispatcher 2 Critical Dave Pigott  10 Fix Released
1061845 #1061845 change vexpress-tc2 health jobs to use a pre-built image LAVA Validation Lab LAVA Validation Lab 3 High Dave Pigott  10 Fix Released
1068213 #1068213 update lab TC2 hack box LAVA Validation Lab LAVA Validation Lab 3 High Dave Pigott  10 Fix Released
1068075 #1068075 Fix up cloud so that it's fully operational LAVA Validation Lab LAVA Validation Lab 4 Medium Dave Pigott  10 Fix Released

Related milestones and releases

This milestone contains Public information
Everyone can see this information.