Apport 2.0.1

Milestone information

Project:
Apport
Series:
main
Version:
2.0.1
Released:
 
Registrant:
Martin Pitt
Release registered:
Active:
No. Drivers cannot target bugs and blueprints to this milestone.  

Download RDF metadata

Activities

Assigned to you:
No blueprints or bugs assigned to you.
Assignees:
No users assigned to blueprints and bugs.
Blueprints:
No blueprints are targeted to this milestone.
Bugs:
No bugs are targeted to this milestone.

Download files for this release

After you've downloaded a file, you can verify its authenticity using its MD5 sum or signature. (How do I verify a download?)

File Description Downloads
download icon apport-2.0.1.tar.gz (md5, sig) release tarball 44
last downloaded 50 weeks ago
Total downloads: 44

Release notes 

Bug fixes:
 * test_ui_gtk.py: Disable package hooks for the tests, as they might ask for
   sudo passwords and other interactive bits, and thus make the tests hang.
 * test_backend_apt_dpkg.py: Fix checks for the installation of -dbgsym
   packages. This should always happen, as the sandboxes have a ddeb apt
   source. Only make it conditional on the system apt sources in the "use
   system config" test.
 * test_report.py: Sleep a bit after calling our test crash script, to ensure
   the kernel has time to finish writing the core file.
 * generic package hook: Also check /tmp for enough space. Thanks Brian Murray.
   (LP: #972933)
 * problem_report.py, write_mime(): Fix regression from version 1.95: Add a
   value as attachment if it is bigger than 1000 bytes, not if it is bigger
   than 100. (LP: #977882)

Improvements:
 * packaging-apt-dpkg.py: Avoid constructing and updating the apt.Cache()
   objects multiple times, to speed up retracing. Thanks Evan Dandrea.
   (LP: #973494)

Changelog 

This release does not have a changelog.

0 blueprints and 0 bugs targeted

There are no feature specifications or bug tasks targeted to this milestone. The project's maintainer, driver, or bug supervisor can target specifications and bug tasks to this milestone to track the things that are expected to be completed for the release.

This milestone contains Public information
Everyone can see this information.